current projects

Protea Glen Extensions 26, 27 and 29
Construction of roads and storm water reticulation and limited bus routes in Protea Glen Ext 26, 27 and 29
Client: Kiron (Pty) Ltd
Consulting Engineers: Infraconsult Engineering CC

Dual Carriageway – Road K29 from Sandspruit to Provincial Freeway, N14 (Phase 2)
IThe Construction of approximately 3,8 km of Dual Carriageway Road K29 from Sand Spruit to Provincial Freeway P-158 (N14), including the construction of a new Bridge 5552 over the Sand Spruit.
Client: GAUTENG Provincial Government, Department of Public Transport, Roads and Works
Engineer: VIAPLAN CC

Dual Carriageway – Road K29 from Sandspruit to Provincial Freeway, N14 (Phase 3)
Upgrading of Malibongwe Drive (K29) including the construction of 5.8 kms of dual carriageway and as the construction of a bridge over the N14 freeway.
Client: Department of Public Works and Transport
Engineer: Aphane Consulting

RCD Joint Venture – Gauteng Freeway Upgrade, Packages D1 & D2
D1 - Gauteng Freeway Improvement Project – Upgrading of National Route 1, Section 21, Between the Brakfontein and Flying Saucer (R21) Interchanges.
D2 - Gauteng Freeway Improvement Project – Upgrading of National Route 1, Section 21, Between Atterbury Road and Scientia (N4) Interchange.
Client: SANRAL
Engineer: D1 – Africon D2 – DCA Joint Venture

Etwatwa Ext. 18
Design and Construction of water and sewer networks systems and toilet structures for 1058 stands in Etwatwa Ext. 18, Benoni
Client: Ekurhuleni Metropolitan Municipality
Engineer: VIP Consulting

Brandfort
Rehabilitation of the R30 between Bloemfontein and Brandfort. This project comprises of the rehabilitation of 40 kms of road inclusive of all layerworks, base surfaces and the manufacturing of all aggregates on site, and the construction of 5 new bridges.
Client: SANRAL
Engineer: AURECON

Construction of Medupi Ash Dumps (Basil Read / Roadcrete Africa JV)
Bulk earthworks, Roads, Liner systems
Client: Eskom
Appointed Engineers: Eskom

St. Micheil's Leisure Estate
Construction of new access road and N4 underpass
Client: Basil Read
Appointed Engineers: SNA Civil Engineers

Bultfontein
Design and Construction (Turnkey) for the Rehabilitation and Repair of poor roads on the Free State Provincial Road Network (Bultfontein to Wesselsbron 18.3km)
Client: Department of Police, Roads and Transport - Free State Province
Consulting Engineers: MRD Consulting Engineers

  print this page   e-mail us